DEVELOPMENT OF METHODOLOGY BASES OF THE NETWORK MATHEMATICAL MODELS TRANSPORTATION AND TECHNOLOGICAL FLOWS TIMBER.
Abstract and keywords
Abstract (English):
The mathematical-mechanical modeling - is the study of complex transport systems (processes) through on-the structure and the research object model. Mathematical models allow a pre-selection of optimal solutions according to specific criteria. These scientifically based and are designed to help leaders in the development, validation and acceptance of efficient, high-quality management decisions in the forest complex. But it must be a pony-mother, that any solution obtained by calculating the mathematical model, optimal only for one or more criteria.

Keywords:
system, timber, structure, technique, production, costs, optimal, products, equation, profit, cost, diagram, algorithm.
Text
Publication text (PDF): Read Download
References

1. Sushkov, S.I. Printsipy resheniya zadach upravleniya v mnogourovnevykh transportno-proizvodstvennykh sistemakh lesnogo kompleksa [Tekst] / S.I. Sushkov, O.N. Burmistrova, Yu.N. Pil´nik. Fundamental´nye issledovaniya. – 2015. – № 11. – Ch. 2. – S. 317-321.

2. Sushkov, S.I. Razrabotka teoreticheskikh osnov planirovaniya i upravleniya transportnymi potokami v lesnom komplekse [Tekst] / S.I. Sushkov, O.N. Burmistrova, Yu.N. Pil´nik. Fundamental´nye issledovaniya. – 2014. – № 8 (6). – S. 1331-1335.

3. Liyanage, C. Measuring Success of PPP Transport Projects: A Cross-Case Analysis of Toll Roads [Text] / C. Liyanage, F. Villalba-Romero. Transport reviews. – 2015. – Vol. 35. – Issue 2. – Special Issue: SI. – rp. 140-161.

4. Hare, W. A mixed-integer linear programming model to optimize the vertical alignment considering blocks and side-slopes in road construction [Text] / W. Hare, Y. Lucet, F. Rahman. European journal of operational research. – 2015. – Vol. 241. – Issue 3. – rp. 631-641.

5. Burdett, R. Block models for improved earthwork allocation planning in linear infrastructure construction [Text] / R. Burdett, E. Kozan, R. Kenley. Engineering optimization. – 2015. – Vol. 47. – Issue 3. – rp. 347-369.

6. Setinc, M. Optimization of a highway project planning using a modified genetic algorithm [Text] / M. Setinc, M. Gradisar, L. Tomat. Optimization. – 2015. – Vol. 64. – Issue 3. – rp. 687-707.

7. Janssen, Thomas Stahlbau Design and conctruction in existing contexts: Replacement of the first High Bridge Levensau [Text]. Janssen Thomasstahlbau. – 2015. – Vol. 84. – Issue 3. – rp. 182-194.


Login or Create
* Forgot password?